Description
Long section at 1:100 through a livestock farm wastewater treatment plant, running from the bar screen and equalisation tank through settling tanks, aerobic and anaerobic biofilters, final settling, disinfection and the control tank, all under a shed roof. Water levels, vents, manholes and pipe outlets are marked, with a lettered key identifying each stage. Free long section wastewater treatment plant CAD block in DWG format, compatible with AutoCAD, BricsCAD and DraftSight.





